Required role: Admin or Manager
Steps
Enter schedule details
Fill in the form:
- Name — a descriptive name (e.g., “HVAC Filter Replacement - Main Building”)
- Description — what maintenance needs to be performed
- Asset or Location — select the asset or location this schedule is for
- Category — the type of maintenance (e.g., HVAC, Electrical)
Set the assignee
Select the technician or team responsible for completing the generated work orders.
Configure recurrence
Set how often the maintenance should occur. See Set Recurrence for detailed options.
Set the start date
Choose when the schedule should begin. The first work order will be generated on or after this date, based on your recurrence settings.
Next steps
Set Recurrence
Learn about the recurrence options available for PM schedules.